A membrane-integrity test conducted by temporarily plugging or otherwise closing any drains and erecting temporary dams where required to retain water on the surface of a waterproofing membrane and then flooding the surface to a maximum depth of 2 inches at the high point and retaining the water for a minimum of 24 hours or as required by the manufacturer. See water testing.
« Back to Glossary